GHRM calculators
Calculators for the manual chapters that have a computational method. Each follows the method written up in its chapter section, draws on the geotechnical properties, railroad, AREMA, railroad-guideline, construction, materials, structural, site investigation, soil mechanics and slopes collections of the library, shows every calculation step, and prints to PDF. English units throughout.
1.0 Introduction
Chapter 1.1Introduction to Railway Ground Hazard Risk Management1 app
2.0 The Underworld
Chapter 2.1Track Foundation Elements1 app
Chapter 2.2Soil and Rock Classification3 apps
Chapter 2.2 · Section 2.2.4.2USCS Soil ClassificationGroup symbol and group name from gradation and Atterberg limits per ASTM D2487, with a plasticity chart and a railroad note for the group.Chapter 2.2 · Section 2.2.17Field Soil Description BuilderWord picture for boring logs from estimated gravel, sand and fines, fines behavior, color, moisture, structure and fill, with the strength term from N, su or manual tests.Chapter 2.2 · Section 2.2.15Expansive Clay HeaveActivity and likely clay mineral for each layer, the PI screen, heave within the active zone from swell test results, and the effect of non-expansive cover thickness.
Chapter 2.3Track Substructure: Ballast, Subballast and Subgrade2 apps
Chapter 2.3 · Section 2.3.2.3Ballast and Subgrade Stress (Talbot)Rail-seat load, tie-ballast pressure, Talbot stress at depth, required ballast plus subballast depth, and a Boussinesq comparison.Chapter 2.3 · Section 2.3.6.1Track Modulus and Rail DeflectionRail deflection, moment and rail-seat load for one or two wheels from an assumed track modulus, or track stiffness and modulus from a measured load and deflection.
Chapter 2.4Silts: Properties, Typical Values and Liquefaction1 app
Chapter 2.5Clays: Properties, Typical Values and Behavior2 apps
Chapter 2.5 · Section 2.5.7.1Settlement Diagnosis on Soft ClaySettlement rate from surfacing or survey records, trend classification, and the bearing factor of safety of the embankment on soft clay.Chapter 2.5 · Section 2.5.7.2Staged Embankment ConstructionStage heights from the 5.53 su screen, strength gain from consolidation of each lift (vertical and, with wick drains, radial), the number of stages and the time to reach the final height.
Chapter 2.6Peats and Organic Soils: Properties, Typical Values and Behavior1 app
Chapter 2.7Rock and Sand: Properties, Typical Values and Behavior2 apps
Chapter 2.7 · Section 2.7.17Rock Mass Rating, GSI and Hoek-BrownRMR89 from five parameters plus orientation, rock mass class with c and φ ranges, GSI, Hoek-Brown mb, s, a, rock mass strength and modulus, and the failure envelope.Chapter 2.7 · Section 2.7.18Rock Wedge Factor of SafetyHoek and Bray comprehensive wedge solution: geometry, weight, water and tension crack, cohesion and friction on each plane, anchor and seismic forces, contact checks, and the minimum anchor tension at its optimum orientation.Chapter 6.6 · Section 6.6.4Q-System Rock Support for Unlined TunnelsRock mass quality Q for a typical section and a fault or weakness zone, the maximum unsupported span against the tunnel span, rock bolt length, and an indicative support class.Chapter 6.6 · Section 6.6.8Arch Tunnel Clearance and Track LoweringHeight available under a semicircular or segmental arch across a clearance envelope, the governing point, the track lowering needed, and the new top of subgrade against the sidewall footing base.
Chapter 2.8Groundwater Characterization and Seepage2 apps
Chapter 2.8 · Section 2.8.5.5Seepage, Layered Permeability and PipingFlow-net seepage quantity, layered (anisotropic) permeability, exit gradient and factor of safety against piping, and a Hazen check of k from D10.Chapter 2.8 · Section 2.8.14Construction Dewatering and Track SettlementEquivalent-well inflow (unconfined or confined), Sichardt radius of influence and well capacity, the number of wells, the drawdown at the track and the settlement it causes.
3.0 Risk Management
Chapter 3.2Desktop Study1 app
Chapter 3.3Drilling Scope1 app
Chapter 3.4Site Review and Reconnaissance4 apps
Chapter 3.4 · Section 3.4.9Rock Slope Kinematic ScreenKinematic screening of a rock face for planar sliding, wedge sliding along joint intersections, and toppling, with intersection lines and apparent dips computed and plotted.Chapter 3.4 · Section 3.4.10Rock Block TopplingGoodman and Bray toppling analysis block by block, from slope geometry or entered block heights: forces, modes, the toe force P0, the friction angle for limiting equilibrium, the factor of safety and the toe anchor force.Chapter 3.4 · Field toolPhoto Album to KMZTurns a shared photo album (download zip, loose photos or a Takeout export) into a Google Earth KMZ with one pin per photo at its GPS location, the photo in the balloon, date folders, the walk path and camera direction.Chapter 3.4 · Desktop toolPlan Set PDF to KMZReviews a plan set PDF sheet by sheet and converts plan views to georeferenced overlays, profiles to curtains along the alignment and cross sections to curtains at their stations, prompting for control points, datum or scales it cannot read.
Chapter 3.5Site Conditions2 apps
Chapter 3.5 · Section 3.5.10Peak Flow and Culvert HeadwaterRational-method peak flows with Kirpich or Kerby time of concentration, and inlet-control headwater checked against the AREMA criteria.Chapter 3.5 · Section 3.5.11Riprap SizingHEC-11 bank and channel riprap, the Isbash relation for turbulent locations and HEC-14 culvert outlet aprons, with stone weight, gradation and layer thickness.
Chapter 3.7Cost Estimates3 apps
Chapter 3.7 · Section 3.7.14Geotechnical Cost Database by StateUnit costs for 160+ design and construction items in every state, with published state DOT prices, a location factor, and an estimate builder with mobilization, contingency and escalation.Chapter 3.7 · Section 3.7.12Track Section QuantitiesBallast and subballast volume and tonnage from the typical section, with undercut and replacement of plastic subgrade and rock in cuts.Chapter 3.7 · Section 3.7.13Earthwork Volumes, Shrinkage and HaulAverage-end-area and prismoidal volumes from stations, shrinkage, swell, waste or borrow, truckloads and the mass diagram.
Chapter 3.8Risk Ratings and Ground Hazard Risk Assessment9 apps
Chapter 3.8 · Section 3.8.9Traffic-Induced Track SettlementBallast and subgrade settlement by year for a given tonnage and wheel load, for new or established track, with the fill-plasticity vulnerability screen.Chapter 3.8 · Section 3.8.29Rock Fall Hazard RatingRHRS-based scoring of a rock cut along track, with continuous scores for height, train exposure and block size, the category breakdown, and the inspection rating with its permissible actions.Chapter 3.8 · Section 3.8.30Trigger Probability over an Exposure PeriodAnnual probability, chance of one or more events in an exposure period, the number of events, the return period for a target chance in a design life, and the band level of Tables 3.8-9 and 3.8-14.Chapter 3.8 · Section 3.8.34Landslide Risk Scores (Hearn)Hearn's Table A4.1 relative risk (magnitude, probability, value and vulnerability) and Table D1.3 risk number with its rank and action, for any number of sites, sorted for comparison with the F × S ranking.Chapter 3.8 · Section 3.8.35Acceptable Probability of FailureAnnual probability of failure, entered or estimated from a factor of safety, its COV and the return period of the condition analyzed, with the lifetime probability, the F band, the Norwegian and Skipp benchmarks and the GEO factor of safety for the consequence.Chapter 3.8 · Section 3.8.40Life-Cycle Cost of MitigationPresent worth, equivalent uniform annual cost and benefit-cost ratio of mitigation alternatives, with annual risk cost as probability times consequence, and a cumulative present-worth chart.Chapter 3.8 · Section 3.8.31Detector and Inspection Evidence (Bayes’ Theorem)How often a slide fence trip, detector alarm or inspection finding is real, how often the hazard is present with no alarm, missed hazards a year, and the effect of a lower false-alarm rate.Chapter 3.8 · Section 3.8.32Hazard Event Rate and Hot Spots (Poisson)Rate of rockfalls, washouts or sinkholes from an incident record with its confidence range, the chance of one or more in a year or a program, a hot-spot check that allows for picking the worst mile, and the frequency index F.Chapter 3.8 · Section 3.8.33Small Data Sets: Confidence Limits and Number of TestsMean, standard deviation and COV of test results, the one-sided lower confidence limit on the mean (Student’s t), mean minus one standard deviation, tests needed for a required precision, and the upper bound on a failure rate from a record with no failures.
Chapter 3.9Geotechnical Investigation Planning and Scope2 apps
Chapter 3.9 · Section 3.9.5.3Boring Spacing, Depth and Footage PlannerBoring number, spacing and depth for eleven railroad features from published criteria, the ASCE stress check for footings, footage, drilling days and train standby.Chapter 3.9 · Section 3.9.15Design Parameters and Probability of FailureMean, standard deviation and COV from tests or the three-sigma rule, comparison with published COV ranges, mean minus one standard deviation, and probability of failure by the Taylor series method.
4.0 Subsurface Exploration
Chapter 4.1Borings and Sampling3 apps
Chapter 4.1 · Section 4.1.15Corridor Boring ProgramQuarter-mile boring series, top-of-cut borrow borings, culvert-end and structure borings, with counts and footage.Chapter 4.1 · Section 4.1.16Sampler Disturbance (Hvorslev)Hvorslev's area ratio, inside and outside clearance, length-to-diameter ratio and recovery, compared with the recommended limits, with common samplers for comparison.Chapter 4.1 · Section 4.1.17Rock Core Recovery and RQDRecovery and RQD run by run and overall, Deere's quality description, first-approximation rock mass properties and allowable bearing pressure, and an RQD check from a volumetric joint count.
5.0 Testing
Chapter 5.1In Situ Testing2 apps
Chapter 5.1 · Section 5.1.15GPR Layer InterpretationLayer thickness and depth from two-way times and dielectric constants, calibration from a pit, resolution by antenna frequency, and a dry-granite fouling estimate.Chapter 5.1 · Section 5.1.2.6CPTu InterpretationCorrected tip resistance, friction ratio, Bq, soil type, undrained strength, OCR and friction angle for each reading, plus ch from a dissipation test, with a depth profile.
Chapter 5.2Laboratory Testing Program5 apps
Chapter 5.2 · Section 5.2.17Shear Strength from Lab TestsMohr-Coulomb c and φ from triaxial (σ3, σ1) or direct shear (σn, τ) results, with Mohr circles, fit quality and strength at a design normal stress.Chapter 5.2 · Section 5.2.21Soil Phase RelationshipsVoid ratio, porosity, water content, saturation and unit weights from a lab specimen, field density or void ratio, with the critical gradient.Chapter 5.2 · Section 5.2.18Ballast Acceptance (AREMA)Sieve analysis against the AREMA band for the size number, plus the limiting test values for the rock type and the concrete-tie exclusions.Chapter 5.2 · Section 5.2.19CU Triaxial Stress PathsTotal and effective stress Kf lines from CU tests with pore pressure, Mohr-Coulomb parameters, Skempton's Af, the implied drained strength, and a field vane strength estimate from PI and OCR, with a p-q plot.Chapter 5.2 · Section 5.2.20Oedometer cv, mv and kRoot time (Taylor) and log time (Casagrande) curve fitting of an oedometer load increment, compression ratios, mv and permeability, in either mm or inch dial units.
Chapter 5.3Construction Monitoring and Field Testing2 apps
Chapter 5.3 · Section 5.3.2.5Compaction Test EvaluationProctor curve fit, maximum dry unit weight and optimum water content, zero-air-voids line, field relative compaction, saturation and accept or reject against the specification.Chapter 5.3 · Section 5.3.19Concrete Mix and Strength AcceptanceRequired average strength, w/cm for strength and durability, the number of cylinder sets per pour, running-average and single-test acceptance, and core acceptance.
6.0 Analysis
Chapter 6.1Foundation Engineering: Bearing Capacity5 apps
Chapter 6.1 · Section 6.1.2.6Shallow Foundation Bearing CapacityVesic method per EM 1110-1-1905: footing shape, embedment, inclined load, water table, local shear, and allowable pressure for a chosen factor of safety.Chapter 6.1 · Section 6.2.3.1Elastic Settlement of FootingsSteinbrenner shape factors in closed form, the Fox depth factor, a weighted modulus over min(H, 5B), and flexible center, flexible corner and rigid settlements, with the effect of Poisson's ratio.Chapter 6.1 · Section 6.1.19Laterally Loaded Piles (Broms)Short, intermediate and long modes for a free or fixed head in clay or sand, ultimate and allowable lateral load, and the embedment needed for a working load.Chapter 6.1 · Section 6.1.20Micropile Axial CapacityFHWA grout-to-ground bond by ground and grouting type, cased and uncased structural capacity in compression and tension, and the bond length for a design load.Chapter 6.1 · Section 6.1.21Pile Group Load DistributionPile loads under a rigid cap from any layout, eccentric load and moments about both axes, with tension and capacity flags.
Chapter 6.2Settlement Analysis2 apps
Chapter 6.2 · Section 6.2.4.3Consolidation Settlement and Time RateSublayered consolidation settlement under a wide fill or a footing (2:1), time to 50% and 90% consolidation, secondary compression, and a settlement-time curve.Chapter 6.2 · Section 6.2.8.1Precompression SurchargeEffective stress at clay mid-depth, degree of consolidation in the time available (mid-depth or average), the surcharge ratio and fill height to remove primary settlement, and the settlement to wait for before removal.
Chapter 6.3Slope Stability Analysis2 apps
Chapter 6.3 · Section 6.3.3.6Infinite Slope and Rock Plane SlideInfinite slope with seepage and planar rock slide with tension crack, water, seismic coefficient and bolt force; FS plotted against water level.Chapter 6.3 · Section 6.3.3.7Circular Slip (Simplified Bishop)Layered Simplified Bishop analysis with a piezometric line, an E80 strip load on the track, an optional seismic coefficient and a grid search for the critical circle, plotted on the section.
Chapter 6.4Infiltration and Seepage2 apps
Chapter 6.4 · Section 6.4.10Ballast Fouling and DrainageFouling index, four-sieve index, single-sieve category, void contaminant index, fouled conductivity and drainage class.Chapter 6.4 · Section 6.4.11Rainfall, Suction and Shallow SlidesSteady suction and effective saturation profiles above the water table for a given infiltration or evaporation rate, and the infinite-slope factor of safety with depth, with and without suction.
Chapter 6.5Seismic Hazard and Liquefaction3 apps
Chapter 6.5 · Section 6.5.5.4Liquefaction Triggering (SPT)Layer-by-layer SPT procedure: corrections, fines adjustment, CSR, CRR, magnitude scaling and factor of safety, with a profile chart.Chapter 6.5 · Section 6.5.18Critical Speed on Soft GroundRayleigh wave critical speed from shear wave velocity, the two-thirds speed limit, and the stiffness needed to meet a remediation ratio.Chapter 6.5 · Section 6.5.8.1Seismic Slope Displacement (Newmark)Static and pseudo-static factors of safety, the yield coefficient by bisection, and Newmark one-way sliding block displacement for sine pulses, a rectangular pulse or a pasted acceleration record, for an infinite slope or a rock plane failure.
7.0 Design
Chapter 7.1Retaining Structures5 apps
Chapter 7.1 · Section 7.1.3.1Lateral Earth Pressure with Railroad SurchargeRankine or Coulomb coefficients, water, uniform surcharge and an E80-type strip surcharge; pressure diagram, thrust, resultant height and overturning moment.Chapter 7.1 · Section 7.1.17Temporary Shoring Next to TrackE80 Boussinesq lateral pressure, resultant and moment, active earth and spoil pressure, and the clearance, deflection and embedment criteria for shoring next to track.Chapter 7.1 · Section 7.1.18Cantilever Sheet Pile Wall (Blum)Coulomb pressures, E80 strip surcharge, numerical moment equilibrium for embedment, the Blum driving allowance, maximum moment, required section modulus and corrosion loss.Chapter 7.1 · Section 7.1.22Cantilever Soldier Pile and Lagging WallActive pressure over the spacing, E80 strip surcharge, discrete-pile passive resistance (arching factor or Eq. 7.1-6), embedment, moment, section modulus and lagging thickness.Chapter 7.1 · Section 7.1.23Braced Excavation Strut LoadsTerzaghi-Peck apparent pressure for sand, soft and stiff clay with uniform and E80 surcharges, strut loads by level and the wale moment.
Chapter 7.2Ground Improvement Methods2 apps
Chapter 7.2 · Section 7.2.7.3Lime Slurry Pressure Injection PlannerInjection holes and stages, slurry, water and hydrated lime quantities, tank loads and track time for a treated length.Chapter 7.2 · Section 7.2.3.4Wick Drain Spacing and Time RateBarron equal-strain radial consolidation with a smear zone, combined with vertical drainage, settlement with and without drains, the spacing needed to reach a target degree of consolidation, and the time to reach it.
Chapter 7.3Pavement Subgrade Evaluation3 apps
Chapter 7.3 · Section 7.3.3.4HMA Trackbed Thickness CheckAllowable tensile strain and subgrade stress from the design repetitions, and the check of chart values for a trial thickness after correction factors.Chapter 7.3 · Section 7.3.18AASHTO 1993 Flexible PavementRequired structural number and layered asphalt, base and subbase thicknesses for crossings, access roads and yards.Chapter 7.3 · Section 7.3.18AASHTO 1993 Rigid PavementConcrete slab thickness from ESALs, reliability, serviceability, concrete properties, load transfer, drainage and k.
8.0 Reporting
Chapter 8.1Exploration Versus Investigation1 app
Appendices