Small Data Sets: Confidence Limits and Number of Tests
Sketch of the inputs
Test results with the mean and the one-sided lower confidence limit on the mean. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; probabilities in a risk rating must come from site records, inspection and the judgment of the responsible engineer, and should be tested at half and double their values before a decision rests on them.
Sources in the library
- T.T. Soong, Fundamentals of Probability and Statistics for Engineers (Wiley, 2004): Chapter 9, sample statistics and interval estimation with the t-distribution
- “Appendix: Mathematics, Symbols, and Physical Constants,” The Civil Engineering Handbook, 2nd edition (CRC Press, 2003): probability definitions and statistical tables
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell