GHRMCalculators · Chapter 6.2, Section 6.2.8.1

Precompression Surcharge

Companion to Chapter 6.2 · Settlement Analysis, Section 6.2.8.1 Precompression: Surcharging to Remove Settlement Before Track Is Built. English units throughout.

Sketch of the inputs

precompressionsurcharge fill γf​ (removed later)permanent load σf​sanddw​clay: Cc​, e0​, cv​, γc​hs​Ht​Time available t; removal criterion; drainage one or two ways

Surcharge placed above the permanent load on sand (thickness hs) over clay (Ht); groundwater at dw. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell