Detector and Inspection Evidence (Bayes’ Theorem)
Sketch of the inputs
Prior probability P(H), detection rate P(A | H) and false-alarm rate P(A | H̄) at a detector-protected rock cut. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; probabilities in a risk rating must come from site records, inspection and the judgment of the responsible engineer, and should be tested at half and double their values before a decision rests on them.
Sources in the library
- T.T. Soong, Fundamentals of Probability and Statistics for Engineers (Wiley, 2004): Chapter 2, conditional probability and Bayes’ theorem
- “Appendix: Mathematics, Symbols, and Physical Constants,” The Civil Engineering Handbook, 2nd edition (CRC Press, 2003): probability definitions and statistical tables
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell