GHRMCalculators · Chapter 3.9, Section 3.9.15

Design Parameters and Probability of Failure

Companion to Chapter 3.9 · Investigation Planning and Scope, Section 3.9.15 Selecting Design Parameters and Estimating Probability of Failure. English units throughout.

Sketch of the inputs

parameter-reliabilityvaluecountLCVmeanHCVparameterFFMLV​Taylor series: F at value ± 1 s.d. of each parameter

Mean and standard deviation from test results (or the three-sigma rule from lowest and highest conceivable values); the Taylor series method combines each parameter’s effect on F. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell