GHRMCalculators · Chapter 3.8, Section 3.8.35

Acceptable Probability of Failure

Companion to Chapter 3.8 · Risk Ratings, Section 3.8.35 Acceptable Probability of Failure by Consequence. English units throughout.

Sketch of the inputs

acceptable-riskfactor of safety Fprobability densityF = 1most likely F, COVpf​Annual pa​, return period Tc​, life n; consequence class

The shaded tail of the factor-of-safety distribution below 1 is the probability of failure; it is compared with acceptable annual probabilities for the consequence class. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell