Micropile Axial Capacity
Sketch of the inputs
A micropile with a cased upper length and an uncased, grouted bond zone of diameter Db and length Lb. Load transfers to the ground by grout-to-ground bond. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources
- FHWA NHI-05-039, Micropile Design and Construction (Sabatini, Tanyu, Armour, Groneck and Keeley, 2005): Chapter 5 (Table 5-3 bond values, allowable structural capacities) and Chapter 7 (load testing).
- AREMA Committee 1 files in the library (Railroad / AREMA / AREMA Comm 1 / Micropile Retaining Walls): micropile and soil-nail walls built from the track for shoulder repairs.