CPTu Interpretation
Sketch of the inputs
Piezocone with tip resistance qc, sleeve friction fs and pore pressure u2 measured behind the cone. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): CPT parameters, soil classification from cone resistance, friction ratio and Bq
- P.J. Sabatini and others, Evaluation of Soil and Rock Properties, FHWA Geotechnical Engineering Circular No. 5: CPT correlations for su, σ′p and φ′, and dissipation analysis
- N. Simons, B. Menzies and M. Matthews, A Short Course in Geotechnical Site Investigation: planning and quality of site investigations
- U.S. Army Corps of Engineers, Geotechnical Investigations, EM 1110-1-1804 (2001): investigation methods and in situ testing
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell