GHRMRisk Assessment & KMZ Apps·Risk Assessment App

Risk Assessment App

Drop in a site and carry one KMZ through the whole ground hazard risk assessment: desktop study from public records, field rating, approved rating, and the scope of work with engineering and construction cost. Each stage saves a KMZ that opens in Google Earth and drops back into the app at the next stage.

Runs in your browser. Public data is read live, so a connection is needed. Your ratings stay in your KMZ files.

Area Desktop study Field form Assessment Scope & cost KMZKMZKMZKMZKMZ + estimate

What it produces

Desktop study

Built from public records for the site area before anyone goes out.

  • Flood zones (FEMA NFHL)
  • Nearby stream gauges (USGS)
  • Geology and stratigraphic column (Macrostrat)
  • Ratings pre-filled where the records support them

Field and approved ratings

The Chapter 3.8 elements on the GHRM 1-to-5 scale, side by side.

  • Desktop, field rated and approved columns
  • Dropdown entry with the rationale for each level
  • Observations placed at your GPS location or on the map
  • Current risk F × S read from the Chapter 3.8 risk matrix, with each step shown

Scope and cost

The approved rating turned into a plan of work.

  • Solution, design, construction-stage and residual risk ratings, with the Chapter 3.8 limits on credit
  • Engineering scope of work
  • Engineering and construction cost estimate
  • Final KMZ with everything in one file

How it works

Step 1

Area

Drop a KMZ, KML or GeoJSON polygon, track line or point, or draw the area on the map.

Step 2

Desktop study

The app reads the public records for the area and pre-fills the desktop ratings. Save the desktop KMZ.

Step 3

Field form

Open the KMZ in the field, add observations and rate each element as found.

Step 4

Assessment

Review desktop and field ratings and set the approved rating with the triggering mechanisms.

Step 5

Scope & cost

Choose the fix, then build the scope of work and the engineering and construction cost estimate.

What it finds for you

  • Flood zone mapping, stream gauges and geology for the site
  • Distances from the site to each feature
  • Where it left off, from any GHRM stage KMZ you drop back in

What you provide

  • The site area: a polygon, track line or point
  • Site ID, railroad, subdivision, milepost and track class
  • Field observations and ratings
  • The approved rating and the chosen fix

Use and limitations

Ready?

Runs in your browser. Public data is read live, so a connection is needed. Your ratings stay in your KMZ files.

Start an assessment →

Risk Assessment & KMZ Apps

Every app produces Google Earth KMZ files that open in Google Earth Pro or Google Earth on the web and drop straight into the Risk Assessment App.