Settlement Diagnosis on Soft Clay
Sketch of the inputs
Track on an embankment of height H over soft clay (su); the ballast record over the settling length L and width W shows whether it is consolidation or bearing failure. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- AREMA conference paper (2015): track leveling and alignment stability, options and approaches for very weak subgrade.
- AREMA conference paper (2020): history of heavy axle load subgrade research at the federal accelerated testing facility.
- AREMA conference paper (2019): remediation of ballast pockets in a 30-ft railway embankment with geogrid and ballast drains.
- AREMA Manual for Railway Engineering, Chapter 1 Roadway and Ballast (2012, Volume 1), Part 1 Roadbed: maintenance exploration of creeping failures.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell