Laterally Loaded Piles (Broms)
Sketch of the inputs
A pile of width b embedded L with a lateral load H at height e. Broms’ simplified soil resistance acts on the pile below the ground; short piles rotate as a rigid body, long piles form a plastic hinge. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources
- FHWA NHI-05-042, Design and Construction of Driven Pile Foundations, Vol. I (2006): Section 9.7, Broms’ method for laterally loaded piles.
- B.B. Broms (1964), Lateral resistance of piles in cohesive soils, and Lateral resistance of piles in cohesionless soils, Journal of the Soil Mechanics and Foundations Division, ASCE, 90(SM2 and SM3).
- B.M. Das, Principles of Foundation Engineering: Broms’ solution for ultimate lateral resistance.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell