GHRMCalculators · Chapter 1.1, Section 1.1.15

Ground Hazard Risk Screening

Companion to Chapter 1.1 · Railway Geo-Hazard Risk Management, Section 1.1.15 Ground Hazard Risk Screening Matrix and Corridor Risk. English units throughout.

Sketch of the inputs

risk-matrixprobability (F, P, R, U, …)severitysiteEach site: hazard type, probability class, severity; exposure period for corridor probability

Each site is placed by probability and severity; the cell gives the risk rating, and the corridor probability uses the exposure period. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell