Consolidation Settlement and Time Rate
Sketch of the inputs
Load q from a wide fill (or a B × L footing) over a clay layer of thickness H starting ztop below the surface; groundwater at zw. Fill creep and self-weight use the fill height Hf. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Settlement Analysis, USACE EM 1110-1-1904 (1990), Settlement folder: procedure, compression index table, time factors and worked examples.
- Consolidation and Settlement Analysis (P. J. Fox, handbook chapter), Soil Mechanics folder: immediate, consolidation and secondary components.
- Rate of Consolidation — Terzaghi Theory (course notes).
- Controlling Differential Settlement of Highway Soft Soil Subgrade (book), Settlement folder: treatment of transitions.
- ICE Manual of Geotechnical Engineering, Vol. II (2012): Ch. 58 (Skinner), Eq. 58.2 and Table 58.3, creep of fills; Ch. 70 (Nowak), Eq. 70.7, embankment self-settlement. Chapter 6.2, Section 6.2.6.1.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell