GHRMCalculators · Chapter 7.2, Section 7.2.3.4

Wick Drain Spacing and Time Rate

Companion to Chapter 7.2 · Ground Improvement Methods, Section 7.2.3.4 Prefabricated Vertical Drains Under Embankments and New Track. English units throughout.

Sketch of the inputs

wick-drainsdrainage blanketclay cv​, ch​sHplan: patternband a × b (or dw​); smear ds​/dw​, kh​/ks​

Vertical drains at spacing s through a clay layer of thickness H; equivalent drain size from band width a and thickness b; smear zone ratio and permeability ratio. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell