Landslide Risk Scores (Hearn)
Sketch of the inputs
Semi-quantitative scores combine landslide magnitude, probability and proximity with the value and vulnerability of the asset below. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Slope Engineering for Mountain Roads (Geological Society of London, Engineering Geology Special Publication): Section A4 (G.J. Hearn), landslide susceptibility, hazard and risk, Table A4.1 and Figure A4.1
- Slope Engineering for Mountain Roads (Geological Society of London, Engineering Geology Special Publication): Section D1 (G.J. Hearn and T. Hunt), slope management, Tables D1.3 to D1.5
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell