Pipeline and Casing Crossings
Sketch of the inputs
Casing pipe crossing under the track: depth from base of rail to top of casing, casing size and wall, and how far the casing extends past the toe of slope or ditch. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- AREMA Manual for Railway Engineering, Chapter 1 Roadway and Ballast (2012, Volume 1), Part 5 Utilities (Table 1-5-1, depth, length and casing requirements) and Part 4 Culverts (Tables 1-4-24 and 1-4-53).
- A Class I railroad's pipeline occupancy specification (2018), Carriers folder: soil investigation, boring and sampling requirements.
- A regional railroad holding company's utility specifications, Carriers folder.
- AREMA conference papers: controlling risks of trenchless pipe construction beneath railways (2020); pipe ramming and the US rail system (2014).