GHRMCalculators · Chapter 6.4, Section 6.4.10

Ballast Fouling and Drainage

Companion to Chapter 6.4 · Infiltration and Seepage, Section 6.4.10 Ballast Fouling Indices and Drainage Capacity. English units throughout.

Sketch of the inputs

ballast-foulingfouled ballastballast voids eb​, Gsb​, kb​; fouling ef​, Gsf​, kf​sieve size (log)% passingNo. 200No. 100No. 43/4 in.

Fine particles fill the voids of clean ballast; the percent passing key sieves (No. 4, No. 200, 3/4 in.) gives the fouling index, and void and conductivity values give the drainage loss. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell