Q-System Rock Support for Unlined Tunnels
Sketch of the inputs
Unlined single-track rock tunnel crossed by a weakness zone, with rock bolts of length L. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site mapping and survey, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- N. Barton, R. Lien and J. Lunde (1974), “Engineering classification of rock masses for the design of tunnel support,” Rock Mechanics 6(4): the Q-system
- E. Grimstad and N. Barton (1993), “Updating the Q-system for NMT”: ESR, unsupported span, bolt length and the support chart
- E. Hoek (2007), Practical Rock Engineering: rock mass classification
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell