Boring Spacing, Depth and Footage Planner
Sketch of the inputs
Boring depth set by the feature: footing width B and pressure q (stress check), embankment or cut height H and compressible depth zc, or pile tip. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- A Class I railroad's public projects geotechnical requirements, 16 Railroad, Carriers folder: quarter-mile boring series, cut and culvert borings.
- A Class I railroad's general requirements for geotechnical investigations for bridge construction projects (2003), Site Investigation folder: one boring for short bridges, 2 B or 10 ft below the pile tip.
- A Class I railroad's pipeline occupancy specification (2018), Carriers folder: borings each side of the track to 5 ft below the invert.
- D. Li, J. Hyslip, T. Sussmann and S. Chrismer, Railway Geotechnics (2016), Section 8.1.2 and Table 8.1: spacing by soil strength, depth 10 to 15 ft below grade.
- B. G. Look, Handbook of Geotechnical Investigation and Design Tables (2007), Table 1.8: guideline to extent of investigation.
- USACE, EM 1110-1-1804 Geotechnical Investigations (2001), Table 2-4: suggested boring programs (after Dunlap 1980).
- B. M. Das, Principles of Geotechnical Engineering, 7th edition, Section 18.1: boring spacing, building depth rules and the ASCE (1972) stress rule; embankments 0.5 to 2 H.
- A Short Course in Geotechnical Site Investigation, Chapter 1: borehole depth of 1.5 B to 2 B and the stress increase under square and strip footings.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell