GHRMCalculators · Chapter 7.1, Section 7.1.23

Braced Excavation Strut Loads

Companion to Chapter 7.1 · Retaining Structures, Section 7.1.23 Braced Excavations and Strut Loads. English units throughout.

Sketch of the inputs

braceHapparentpressurestruts at spacing sStruts carry the apparent pressure by tributary (hinge) spans; the base carries the lowest half-span.

A braced trench of depth H with struts at several levels; the apparent pressure envelope is applied to the wall and shared among the struts. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell