GHRMCalculators · Chapter 3.8, Section 3.8.29

Rock Fall Hazard Rating

Companion to Chapter 3.8 · Risk Ratings, Section 3.8.29 Rock Fall Hazard Rating for Cuts Along Track. English units throughout.

Sketch of the inputs

rockfall-ratingditchHblock sizeSection length Ls​; trains per day N, length Lt​, speed V; geology, climate, history

Rock cut of height H above the track with a catchment ditch; hazard scored from slope, ditch, traffic exposure, geology, block size, climate and history. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell