GHRMCalculators · Chapter 4.1, Section 4.1.16

Sampler Disturbance (Hvorslev)

Companion to Chapter 4.1 · Borings and Sampling, Section 4.1.16 Sample Disturbance: Sampler Geometry and Recovery. English units throughout.

Sketch of the inputs

sampler-qualityDw​De​Ds​Dt​L (pushed); Lr​ (recovered)Area ratio = (Dw​² − De​²)/De​²; inside clearance = (Ds​ − De​)/De​; recovery = Lr​/L

Thin-wall tube with cutting shoe: outside diameter Dw, shoe inside diameter De, tube inside diameter Ds and outside diameter Dt; pushed length L and recovered length Lr. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell