Riprap for Embankments, Channels and Culvert Outlets
Sketch of the inputs
Riprap on an embankment slope along a channel: average velocity V, flow depth d, slope angle θ, stone size D50 and layer thickness on a filter. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources
- FHWA HEC-11, Design of Riprap Revetment (1989): Equation 4.1 with the specific-gravity and stability-factor corrections.
- FHWA HEC-14, Hydraulic Design of Energy Dissipators for Culverts and Channels (2006): Equation 10.4, riprap apron stone size.
- FHWA HEC-23, Bridge Scour and Stream Instability Countermeasures (2009): Isbash relation for high-turbulence locations.
- AREMA Manual for Railway Engineering, Chapter 1, Part 3 (drainage) and Part 4 (culverts).
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell