The Manual
The full GHRM reference, from ground behavior to reporting.
Each section has its own landing page with its chapters and tools:
- 1.0IntroductionManual overview; introduction to railway ground hazard risk management→
- 2.0The UnderworldTrack foundation, failure mechanisms and triggers, soils and rock, silts, clays, peats, groundwater, and problem ground (collapsible soils, old fills, karst, reactive mudrocks, residual soils)→
- 3.0Risk ManagementScoping, desktop study, drilling scope, reconnaissance, site conditions, access, cost estimates, risk ratings and assessment, investigation planning, mining hazards→
- 4.0Subsurface ExplorationBorings and sampling→
- 5.0TestingIn situ, laboratory, geo-environmental, construction monitoring, the observational method→
- 6.0AnalysisBearing capacity, settlement, slope stability, seepage, seismic, with the apps and analytical tools→
- 7.0DesignRetaining structures, ground improvement, pavement subgrade, earthworks asset management→
- 8.0ReportingExploration vs. investigation, change orders, memorandums, geotechnical reports→
- App.AppendicesTemplates and special provisions, typical soil properties, analytical equations, ICE manual cross-reference→