Reference manual · dirtbert.com
Railway Ground Hazard Risk Management
A practical reference for finding, ranking and fixing ground hazards along a railroad, from the risk framework and the ground beneath the track to risk management, exploration, testing, analysis, design and reporting.
By Daniel P. Colwell and Mario Ruel. With thanks to Mario, whose dedication to this program shaped the work and strengthened the commitment to bring its principles to Class I railroads.
Contents
Eight sections along the line, plus the appendices. Select a station to see its chapters.
Print a chapter
Each Print button opens the chapter in a new tab with every section expanded and starts printing. Choose “Save as PDF” in the print dialog for a PDF copy. Every page is marked DRAFT. Chapters also have a Print chapter button at the top.
- Chapter 1.0Manual OverviewPrint
- Chapter 1.1Introduction to Railway Ground Hazard Risk ManagementPrint
- Chapter 2.1Track Foundation ElementsPrint
- Chapter 2.2Soil and Rock ClassificationPrint
- Chapter 2.3Track Substructure: Ballast, Subballast and SubgradePrint
- Chapter 2.4Silts: Properties, Typical Values and LiquefactionPrint
- Chapter 2.5Clays: Properties, Typical Values and BehaviorPrint
- Chapter 2.6Peats and Organic Soils: Properties, Typical Values and BehaviorPrint
- Chapter 2.7Rock and Sand: Properties, Typical Values and BehaviorPrint
- Chapter 2.8Groundwater Characterization and SeepagePrint
- Chapter 3.1Scoping ProposalsPrint
- Chapter 3.2Desktop StudyPrint
- Chapter 3.3Drilling ScopePrint
- Chapter 3.4Site Review and ReconnaissancePrint
- Chapter 3.5Site ConditionsPrint
- Chapter 3.6Site Accessibility StudyPrint
- Chapter 3.7Cost EstimatesPrint
- Chapter 3.8Risk Ratings and Ground Hazard Risk AssessmentPrint
- Chapter 3.9Geotechnical Investigation Planning and ScopePrint
- Chapter 4.1Borings and SamplingPrint
- Chapter 5.1In Situ TestingPrint
- Chapter 5.2Laboratory Testing ProgramPrint
- Chapter 5.3Construction Monitoring and Field TestingPrint
- Chapter 6.1Foundation Engineering: Bearing CapacityPrint
- Chapter 6.2Settlement AnalysisPrint
- Chapter 6.3Slope Stability AnalysisPrint
- Chapter 6.4Infiltration and SeepagePrint
- Chapter 6.5Seismic Hazard and LiquefactionPrint
- Chapter 6.6Tunnels and PortalsPrint
- Chapter 7.1Retaining StructuresPrint
- Chapter 7.2Ground Improvement MethodsPrint
- Chapter 7.3Pavement Subgrade EvaluationPrint
- Chapter 8.1Exploration Versus InvestigationPrint
- Chapter 8.2Change OrdersPrint
- Chapter 8.3MemorandumsPrint
- Chapter 8.4Geotechnical Report PreparationPrint
- Appendices A–CAppendicesPrint
- Appendix DTypical Soil Properties from Blow Counts, Moisture Content and Liquid LimitPrint
- Appendix FAnalytical EquationsPrint