Staged Embankment Construction
Sketch of the inputs
Embankment of final height Ht built in stages on soft clay of thickness H; strength gain between stages from consolidation. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: Chapter 11, analyses of embankments with partial consolidation, observed behavior of staged fills, and Eq. 7.10
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: Skempton's strength ratio relation and consolidation
- B.M. Das, Advanced Soil Mechanics, 4th edition: radial consolidation (Barron) and precompression
- R.F. Craig, Craig's Soil Mechanics, 7th edition: vertical drains and staged loading
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell