Rock Mass Rating, GSI and Hoek-Brown
Sketch of the inputs
Jointed rock mass (intact UCS, RQD, joint spacing and condition, groundwater) rated to RMR and GSI, giving the Hoek–Brown strength envelope with mi and disturbance D. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Rock Foundations, USACE EM 1110-1-2908 (1994): RQD, Geomechanics (RMR) and Q-system, shear strength of discontinuities.
- Rock Mass Classification: A Practical Approach in Civil Engineering (Singh and Goel), Rock Mechanics folder.
- Rock Mechanics: An Introduction and Advances in Rock-Support and Geotechnical Engineering, Rock Mechanics folder.
- Rock Slope Engineering (Wyllie and Mah), 09 Slopes folder: application to cut slopes.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell