HMA Trackbed Thickness Check
Sketch of the inputs
Asphalt underlayment of thickness H and modulus E1 under ballast; checks tensile strain at its base and stress on the subgrade. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Huang, Rose and Khoury, Thickness Design for Hot-Mix Asphalt Railroad Trackbeds (scanned paper; text read by OCR).
- Design and Construction of Pavements and Rail Tracks (Balkema): asphalt and processed materials in trackbeds.
- Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 10: asphalt trackbed applications.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell