Rock Core Recovery and RQD
Sketch of the inputs
Core run with intact pieces; RQD counts only pieces at least 4 in. long. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: Section 18.7, rock coring, recovery ratio, RQD (Eqs. 18.34 and 18.35, Tables 18.6 and 18.7)
- B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): Tables 9.13, 18.11 and 22.1, rock properties and bearing pressure from RQD and joint count
- U.S. Army Corps of Engineers, Geotechnical Investigations, EM 1110-1-1804 (2001): rock coring, logging of core loss and RQD per run
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell