Temporary Shoring Next to Track
Sketch of the inputs
Shoring face at S from the track centerline, excavation depth H below base of tie, E80 axle on ties of length Lt, spoil pile beside the cut. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Joint guidelines for temporary shoring of two Class I railroads (2004), Carriers folder: criteria, sample problem and Chart A.
- A Class I railroad's pipeline occupancy specification (2018), Carriers folder: E80 strip surcharge (q = 1,882 psf with 8.5 ft ties).
- AREMA conference papers: retaining wall design for railroad infrastructure (2014); emergency and non-emergency earth retaining with pressed-in sheet piles (2019).
- AREMA Committee 1 files on micropile retaining walls and tieback shoulder repairs, AREMA folder.