CU Triaxial Stress Paths
Sketch of the inputs
Effective stress paths of CU triaxial specimens consolidated to σ3, rising to the failure line that defines c′ and φ′. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: Chapter 12, CU tests, Examples 12.6 to 12.9, stress paths and the Kf line, and Skempton's vane strength relation
- M. Budhu, Soil Mechanics and Foundations, 3rd edition: stress paths, pore pressure parameters and critical state interpretation
- R.F. Craig, Craig's Soil Mechanics, 7th edition: triaxial testing and pore pressure coefficients
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell