GHRMCalculators · Chapter 7.1, Section 7.1.18

Cantilever Sheet Pile Wall (Blum)

Companion to Chapter 7.1 · Retaining Structures, Section 7.1.18 Cantilever Sheet Pile Walls by the Blum Method. English units throughout.

Sketch of the inputs

sheet-pile-cantileverSqHD (embedment)soil γ, φ, δa​passive δp​Factors: γG​ on earth pressure, γQ​ on surcharge, γEp​ on passive

Cantilever sheet pile with retained height H and embedment D, track at S from the wall; active pressure behind, passive resistance in front. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell