Elastic Settlement of Footings
Sketch of the inputs
Footing B × L at depth Df with net pressure Δσ on layered soil (moduli Ei) above a rigid layer at depth H. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- B.M. Das, Principles of Geotechnical Engineering, 7th edition: Section 11.2, elastic settlement (Eqs. 11.1 to 11.10, Tables 11.1 to 11.5, Example 11.1), and CPT modulus correlations (Eqs. 18.23 and 18.24)
- R.F. Craig, Craig's Soil Mechanics, 7th edition: immediate settlement and elastic stress distribution
- B.G. Look, Handbook of Geotechnical Investigation and Design Tables (2007): soil modulus values
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell