Seepage, Layered Permeability and Piping
Sketch of the inputs
Flow under a structure with total head loss ΔH; the flow net (Nf channels, Nd drops) gives seepage, and the last square lexit gives the exit gradient. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Seepage — Flow Nets and Seepage — Heterogeneous Soil (course notes), Seepage folder.
- Seepage Analysis and Control for Dams (USACE EM 1110-2-1901), Seepage folder: filters, relief wells and piping control.
- Permeability (course notes): Darcy's law, laboratory tests and Hazen's relation.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell