GPR Layer Interpretation
Sketch of the inputs
GPR pulse reflects at layer boundaries; each layer thickness comes from its two-way travel time and wave velocity. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Railroad Ballast Evaluation Using Ground-Penetrating Radar (Transportation Research Record 2159), GPR folder: dielectric tests on fouled and wet ballast.
- Subsurface Evaluation of Railway Track Using Ground Penetrating Radar (report), GPR folder.
- Computational Methods for Processing Ground Penetrating Radar Data (thesis), GPR folder.
- Railway Geotechnics (Li, Hyslip, Sussmann and Chrismer, 2016), Chapter 8: GPR, wavelength and dielectric table.
- McHenry and Rose, Railroad Subgrade Performance Indicators: A Review of Available Testing Methods, Ballast folder.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell