GHRMCalculators · Chapter 2.6, Section 2.6.15

Mass Stabilization Quantities

Companion to Chapter 2.6 · Peats and Organic Soils, Section 2.6.15 Mass Stabilization of Peat Beside and Beneath Track. English units throughout.

Sketch of the inputs

mass-stabilizationstabilized block (binder)LDWn zones; binder rate (lb/yd³); price; production per shift

Treated block of length L, width W and depth D mixed in place with binder. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell