GHRMCalculators · Chapter 6.1, Section 6.1.2.6

Shallow Foundation Bearing Capacity

Companion to Chapter 6.1 · Bearing Capacity, Section 6.1.2.6 Vesic Bearing Capacity Method and Calculator. English units throughout.

Sketch of the inputs

bearing-capacitygroundwaterQTBDDw​γ above waterγsat​ below waterφ′, cshear zoneW = footing length (into page)

Footing of width B and length W at depth D, vertical load Q with horizontal load T; groundwater at depth Dw below ground. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell