GHRMCalculators · Chapter 2.3, Section 2.3.2.3

Ballast and Subgrade Stress (Talbot)

Companion to Chapter 2.3 · Track Substructure, Section 2.3.2.3 Ballast and Subgrade Stress Calculator (Talbot Method). English units throughout.

Sketch of the inputs

track-stresswheel D, static load P, speed Vtie length Lt​pa​ (tie–ballast)hb​pc​ (subgrade) ≤ allowableTie bottom width bt​; bearing fraction; rail-seat distribution factor DF; impact 33V/(100D)

Wheel load with impact goes through the rail seat to the tie (length Lt, width bt), then spreads through ballast depth hb to the subgrade (Talbot). Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell