USCS Soil Classification
Sketch of the inputs
Plasticity chart: LL and PI place fines above or below the A-line; coarse soils use gravel, sand and fines percentages and the gradation coefficients from D10, D30, D60. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- ASTM D2487-06, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System), Soil Mechanics folder.
- Basic Soil Characteristics (course notes) and Soil Mechanics Laboratory Manual, Soil Mechanics folder.
- An Introduction to Geotechnical Engineering (Holtz and Kovacs), Soil Mechanics folder: classification background.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell