Life-Cycle Cost of Mitigation
Sketch of the inputs
Cash flows of each alternative (first cost, annual maintenance, periodic renewals) discounted at rate i over N years. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- W.G. Sullivan, E.M. Wicks and C.P. Koelling, Engineering Economy, 16th edition: interest factors, present worth, annual worth and the benefit-cost ratio method
- O. Cretu, R. Stewart and T. Berends, Risk Management for Design and Construction (Wiley, 2011): probability and consequence in project risk
- P. Domone and J. Illston (eds.), Construction Materials: Their Nature and Behaviour, 4th edition: service life and deterioration of concrete, steel, timber and masonry
- M.F. Ashby and D.R.H. Jones, Engineering Materials 1: An Introduction to Properties, Applications and Design, 3rd edition: corrosion and wear of metals
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell