Peak Flow and Culvert Headwater
Sketch of the inputs
Runoff from drainage area A reaches the culvert after time tc; peak flow (rational method) and inlet control give the headwater HW against the height Hf to base of rail. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- AREMA Manual for Railway Engineering, Chapter 1 (2019 edition), Part 3 Natural Waterways: rational method, runoff coefficients, Kirpich and Kerby equations.
- AREMA Manual for Railway Engineering, Chapter 1 Roadway and Ballast (2012, Volume 1), Part 4 Culverts: design method (25-year and 100-year criteria) and inlet control charts.
- A Class I railroad's guidelines for under-track culverts, Carriers folder: 100-year storm, HW/D, 36 in. minimum, pipe materials.
- AREMA conference papers: culvert inspection criteria and rapid condition assessment (2016); drainage at a grade separation (2014).
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell