Compaction Test Evaluation
Sketch of the inputs
Proctor curve from the lab points gives γd,max and wopt; the field dry unit weight and water content must fall above the required relative compaction and inside the moisture window. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- Mass-Volume Relationships and Compaction (course notes).
- Soil Mechanics Laboratory Manual, Soil Mechanics folder: Proctor and field density procedures.
- Handbook of Geotechnical Investigation and Design Tables (Look), Site Investigation folder: compaction criteria.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell