Subballast Filter and Thickness
Sketch of the inputs
Subballast between ballast and subgrade must filter the subgrade (retention by D15/D85 rules) and spread load so the subgrade pressure stays below pc. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.