GHRMCalculators · Chapter 4.1, Section 4.1.15

Corridor Boring Program

Companion to Chapter 4.1 · Borings and Sampling, Section 4.1.15 Boring Programs for Track Widening and New Track. English units throughout.

Sketch of the inputs

corridor-boringsdG​dM​dD​top of grademidslopeditchSeries every sp​ ft along length L; cut share; average cut height Hc​; culverts and structures

A boring series at each station: top of grade (depth dG), midslope (dM) and ditch line (dD), repeated at spacing sp along the corridor. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell