Corridor Boring Program
Sketch of the inputs
A boring series at each station: top of grade (depth dG), midslope (dM) and ditch line (dD), repeated at spacing sp along the corridor. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- A Class I railroad's public projects geotechnical requirements, Carriers folder.
- AREMA Manual for Railway Engineering, Chapter 1 Roadway and Ballast (2012, Volume 1), Part 1, Section 1.1 Exploration and testing.
- AREMA conference paper (2018): managing geotechnical risk.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell