GHRMCalculators · Chapter 3.7, Section 3.7.12

Track Section Quantities

Companion to Chapter 3.7 · Cost Estimates, Section 3.7.12 Track Section Quantities for Estimates. English units throughout.

Sketch of the inputs

track-quantitiessubballast dsb​track centersLt​hb​wsb​shoulder shslope bs​Ties tw​ × td​ at spacing ts​; lengths Lx​, cut Lcut​, undercut du​, rock Lrock​

Track section with ties of length Lt at the track centers, ballast depth hb and shoulder, side slope, and subballast of depth dsb and top width wsb. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell