Ballast Acceptance (AREMA)
Sketch of the inputs
Sample gradation compared with the AREMA band for the specified size; physical tests checked against limits. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources in the library
- AREMA Manual for Railway Engineering, Chapter 1 (2019 edition), Part 2 Ballast: Tables 1-2-1 and 1-2-2, concrete tie restrictions.
- AREMA conference paper (2014): petrographic evaluation of ballast suitability, a case study.
- AREMA conference paper (2021): testing and characterization of dolomite aggregate for ballasted track on a new passenger line.
- AREMA conference papers (2015, 2018): ballast properties and degradation trends; principles of degraded ballast and track safety.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell