Hazard Event Rate and Hot Spots (Poisson)
Sketch of the inputs
Events onto the track in the record, by location along the segment. Not to scale.
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; probabilities in a risk rating must come from site records, inspection and the judgment of the responsible engineer, and should be tested at half and double their values before a decision rests on them.
Sources in the library
- T.T. Soong, Fundamentals of Probability and Statistics for Engineers (Wiley, 2004): Chapter 6, Poisson distribution; Chapter 9, interval estimation
- “Appendix: Mathematics, Symbols, and Physical Constants,” The Civil Engineering Handbook, 2nd edition (CRC Press, 2003): probability definitions and statistical tables
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell