GHRMCalculators · Chapter 3.4, Section 3.4.10

Rock Block Toppling

Companion to Chapter 3.4 · Site Review and Reconnaissance, Section 3.4.10 Block Toppling of Rock Cuts. English units throughout.

Sketch of the inputs

rock-topplingHxstepped base: step per blockFace ψf​, layer dip ψd​ into face,upper slope ψs​, block friction φ, γanchor at toe, plunge

Slope of height H cut into rock layers of thickness x dipping into the face; blocks on a stepped base topple progressively; a toe anchor can hold the toe blocks. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources in the library

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell