GHRMCalculators · Chapter 7.3, Section 7.3.18

AASHTO 1993 Flexible Pavement Design

Companion to Chapter 7.3 · Pavement Subgrade Evaluation, Section 7.3.18 AASHTO 1993 Pavement Design for Crossings, Access Roads and Yards. English units throughout.

Sketch of the inputs

flexAsphalt D1, a1Base D2, a2, m2Subbase D3, a3, m3Roadbed soil, MRW18 (18-kip ESALs)SN = a1D1 + a2m2D2 + a3m3D3; each layer protects the one below it.

Asphalt, base and subbase layers over the roadbed soil. Each layer is sized so that the structural number above it protects the layer below. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.

Sources

GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell