Arch Tunnel Clearance and Track Lowering

Companion to Chapter 6.6 · Tunnels and Portals, Section 6.6.8 Clearance Improvement Projects. English units. The default inputs reproduce the worked example in that section.

Sketch of the inputs

tunnel-clearanceenvelope H × 2bexisting TORlowered TOR, Δ = ?footingspringliney(x) = hs + √(R² − x²) − (R − f)Δ = max over envelope of H − y(x)new subgrade = Δ + t vs footingCorners of the envelope,not the crown, usuallygovern in an arch

Arch tunnel profile with the clearance envelope on the existing and the lowered track. Not to scale.

Use and limitations

This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site mapping and survey, the governing railroad and agency standards, and the judgment of the responsible engineer.